Khasab Khalidiyah+Link Roads
414
Ministry of Transport & Communications
The road connects khasab to Al Khalidyyah for a length of 20.400 km, as improvement of the existing alignment. The realignment involves the connections with several villages all along, for which new link roads have been design as well. The total length of these 15 links is about 22 km.
1) Detailed Topographic Survey
2) Traffic Study
3) Perform a hydrology study and hydraulic design to determine the drainage structures
4)????? Study alternative alignment through aerial photographs and mapping
5) Design all necessary structures and other elements
6) Prepare design report, concept design, preliminary and detailed design, Engineers cost estimate and tender documents
7) Coordination with concerned authorities to obtain their approval on the design
8) Construction supervision
Roads
Preliminary Design
Final Design-Design Review
Supervision
1-Jun-08
Completed