a New Permanent Outlet Structure for Tanuf, Sarooj, Muayden Dams
1133
Oman
Ministry of Regional Municipalities & Water Resources
The Ministry of Regional Municipalities and Water Resources required the execution of Leakage Prevention Measures at Wadi Al Muaydin dam, Construction of a new Intak Structure & Associated pipework at Tanuf Dam and A'Sarooj Recharge is part of recharge schemes of agriculture development in the Musandam Region.
1) Setting up at borehole positions and rotary core drilling
2) Water test and grouting with OPC and bentonite
3) Prepare factual report
4) Excavation for the foundations of the new intake structure, columns and valve boxes.
5) Trench excavation for the new pipeline
6) Construction of the access bridge and supports
7) Construction of valve boxes
8) Laying of new pipeline, connecting the pipework to the existing pipes and commissioning
9) Installation and commissioning of the valves and actuators
10) Installation of handrails to the access bridge
11) Construction supervision
Dams
Preliminary Design
Final Design-Design Review
1-Oct-11
On going