Dualisation of Seih al Maleh Street from existing Signalized Junction to PDO Gate 2
1138
Oman
Petroleum Development Oman LLC
Dualisation of existing single carriageway from the Signalized junction to PDO Gate 2 and upgradation of existing junctions and accessess. The project comprises of two phases. Phase I comprises of traffic study and development of concept design. Phase II consists of detailed design and preparation of tender documents.
1) Traffic Study, Development of options and their evaluation, Concept Design in consultation with Client, Muscat Municipality and Royal Oman Police. Detailed design services comprise of geometric design, pavement design, traffic control plans, street lighting, drainage design, traffic signal design and landscape design. Study of existing utility services and development of Protection/ Relocation plans.
2) Construction supervision
Roads
Preliminary Design
Final Design-Design Review
12-Nov-11
On going