Project Location:
The project area is located Deem area in Al Amirat Wilayat, Muscat Governorate.
Objectives of the Project:
The objective of the creation of a storage reservoir at Deem in order to fulfill the PAEW’s security of water supply requirements by providing 48 hours storage related to production capacity and to meet the increasing potable water in Muscat Governorate from new sources planned to be developed in Muscat East.
According to the TOR, the Scope of Work is detailed as follows:
In order to meet the increasing demand in Muscat Governorate, Qurayat IWP Desalination Plant (by OPWP) and Wadi Dayqah Surface Water Treatment Plant (by PAEW) have been planned. The water will be transmitted to Deem & Amirat existing and future reservoirs as well as to other distribution reservoirs.
Deem future strategic reservoir is proposed to be constructed adjacent to the existing 23 ML Deem reservoir because it is located at a strategic site between Qurayat and Muscat.
The proposed scope of work is as follow: