Project Location:
The Wadi Aday is located in the South of Muscat. The (G2) Flood Protection Dam is located in Wadi Aday Gorge, in the upstream gorge of Al Amerat bowl, along of the new road No 17 Qurum – Al Amerat, about 1.2 km upstream the village of Wadi Aday.
The main components of the project:
According to the TOR, the Scope of Work is detailed as follows:
According to the TOR, the Scope of Work is detailed as follows:
Stage A – Design Review and Tender Documents Adjustments
Stage B - Tender Action, Construction Supervision and maintenance period
Based on the requirements of the TOR and the Consultant’s considerable experience in these types of studies the project will be divided in the following sub-stages: