Road Improvement at Al Muballa Dual Carriage
1136
Oman
Ali & Co. Trading
Dualisation of 1.8km long exising single carriageway along with upgradation of junctions and cross-drainage structures.
1) Geometric and Pavement design of road and junctions
2) Traffic Control Plans
3) Storm drainage design along with hydraulic design of 10 cell culvert and Street lighting Design
Roads
Preliminary Design
Final Design-Design Review
11-Nov-11
Completed