• Asphalt Road to Kubut village at Marmul

     

  • Project Number:

    1215

     

  • Project Country:

     Oman

     

  • Client Name:

     Best Infrastructure Developers LLC

     

  • Narrative Description of the Project:

    Design and Construction of Asphalt Road to Kubut Village at Marmul (14 kms). The work includes 8.2 meter wide carriage way with 2.0 meters of hard shoulder on either side. The wadi portions shall be designed using Irish crossings (or Pipe culverts of 900 mm diameter) and protection slabs for existing PDO pipe line crossings.

     

  • Description:

    1) Detailed Topographic Survey
    2) Traffic Study
    3) Perform a hydrology study and hydraulic design to determine the drainage structures
    4) Prepare preliminary and detailed design
    5) Coordination with concerned authorities to obtain their approval of the design


     

  • Project Sector:

    Roads

     

  • Services:

    Preliminary Design
    Final Design-Design Review

     

  • Project Start Date:

    12-Jun-12

     

  • Project Status:

    Completed

     

  •  

Project Country
Project Sector
SERVICES
Project Status