all Weather Roads from Qumayrah to Al Khanabishah
921
Oman
Ministry of Transport & Communications
The classification of the road is "Secondary Road" connecting the village of Qumayrah to that of Al Khanabishah. The purpose of the road is to serve the various settlements along the alignment who are currently using the existing unpaved track along which, in several occasion during the rainy season, traffic is disrupted because of the mud and the high water level at the many wadi crossing. The road runs through rolling/mountainous terrain and consists of a two lane carriageway; it also includes several single to multicell drainage structures. The total lenght of the road is about 22 km.
1) Corridor Study
2) Topographic Survey
3) Hydrology study and hydraulic design to determine the drainage structures
4) Study alternative alignment in the hilly area through aerial photographs and mapping
5) Preliminary and final design
6) Preparation of the Design Report
7) Preparation of the tender Documents
8) Coordination with concerned authorities to obtain their approval
Roads
Preliminary Design
Final Design-Design Review
8-Dec-09
Completed