Assessment of the existing tailing dam for stability of the dam wall, slope stability to determine life time of existing dam facility. Tailing Dam capacity enhancement measures
1125
Oman
Mawarid
Renardet reviewed the stability of the existing tailings dam and designed features to allow capacity enhacement of the existing operations. The works includes raising the earthfill embankment to increrase capacity, installation of a waterproof mambrane to the new areas as well as the higher slopes, design of a new access road at a higher elevation and new delivery and return pipework. Coordination between the production facility and the construction team is critical to minimise downtime.
1) Stability Analysis and embankment design
2) Drainage network
3) Pipline flow analysis
4) Road works and water recovery system design
5) Construction supervision
Dams
Preliminary Design
Final Design-Design Review
Supervision
13-Jul-11
Completed